ZenithOwner.com
ZenithOwner.com Forum LinkZenithOwner.com Home ButtonZenithOwner.com Builder's ListZentihOwner.com DownloadsZenithOwner.com Contact
LEARN | BUILD | FLY
Zenith Cruzer I still can't finish up the rear fuselage because I'm waiting on my powder coated steel pieces. So, I thought I'd build the firewall.
   
Zenith Cruzer There's a lot of work building this! Every piece needs a lot of edge finishing and deburring. I'm completely finishing each piece before I cleco it together.
   
Zenith Cruzer Here's what I have done so far today. All of these pieces are ready to rivet-they are deburred, edge finished, and cleaned up.

I ordered the Eggenfeller spring upgrade so I can eliminate the nose wheel bungee. I think it's a much better option but it set me back $415.00 with shipping. I don't want to rivet anything until I get the parts incase I need to remove some parts or drill and debur.

   

Home