ZenithOwner.com
ZenithOwner.com Forum LinkZenithOwner.com Home ButtonZenithOwner.com Builder's ListZentihOwner.com DownloadsZenithOwner.com Contact
LEARN | BUILD | FLY
Zenith Cruzer I finished installing the nose gear today.
   
Zenith Cruzer This part will still need adjusted once the engine is installed and weight is on the nose. There's a washer that goes between the top nut and the felt piece, and that washer disappeared somehow. I'll have to search the floor.
   
Zenith Cruzer This white piece was just installed today. I took it to get powder coated yesterday and picked it up today.
   
Zenith Cruzer I also bolted the bottom nose strut piece to the bottom of the fuse.
   
Zenith Cruzer Here's the underside.
   
Zenith Cruzer I ordered this rubberized non-skid material from Amazon. I cut it to shape and stuck it in place as it comes with a sticky back. It's basically one big sticker. Since it's the rubber type, it's not the rough sandpaper like anti-skid tape that you might see on concrete stairs.

Here's a link if you want to buy it. You will need two pieces at $6.95 each.

 

   
Zenith Cruzer  
   
Zenith Cruzer  
   
Zenith Cruzer Next I started finishing up the torque tube install. Here the bellcrank is installed.
   
Zenith Cruzer This is the front end. The collar will come back off for some primer and it will all be greased up before I re-install the bolt and nut.
   
Zenith Cruzer Just another shot of the back end.
   

Home